Milestones

A Legacy of Innovation

  • 2026

    Start of construction of the Arctic Security Cutters, the first U.S. governmental vessels built outside the United States

  • 2025

    Start of construction of Polar Max, one of the world’s most powerful diesel-electric icebreakers

  • 2021

    Delivery of SH Minerva, an extremely high ice class (PC5) expedition cruise vessel for Antarctic operation

  • 2016

    Delivery of Polaris, the world’s first lower-emission diesel and LNG powered icebreaker

  • 2014

    Delivery of the world’s first oblique icebreaker Baltika, an icebreaking emergency and rescue vessel

  • 1998

    Delivery of MS Elation, the world’s first cruise vessel with Azipod propulsion units

  • 1990

    The shipyard developed Azipod technology in collaboration with ABB and the Finnish National Board of Navigation

  • 1988

    Delivery of Taymyr, the world’s first nuclear icebreaker built outside Russia. The nuclear reactor was installed in St. Petersburg

  • 1976

    Delivery of Finnjet, the world’s largest and fastest passenger ferry, powered by gas turbines

  • 1969

    Delivery of MS Song of Norway for Royal Caribbean, the world’s largest and first purpose-built cruise vessel

  • 1960

    Delivery of Moskva, the world’s first diesel-electric heavy polar icebreaker

  • 1954

    Delivery of Voima, the world’s first four-screw diesel-electric icebreaker

Our facility

Helsinki Shipyard facility
  • Covered dry dock

    The covered dry dock measures 280 meters in length and 33 meters in width.

    The largest covered dry dock in Northern Europe is the crown jewel of Helsinki Shipyard’s facilities. The dry dock’s intermediate gate system makes work on parallel projects possible.

  • Assembly hall

    The assembly hall supports block fabrication and advanced heavy welding, providing flexibility for project requirements and production schedules.

  • Outfitting hall

    The outfitting hall can accommodate up to five blocks at the same time, supporting parallel work phases and efficient project flow.

  • Outfitting workshop & Welding Academy

    The dedicated workshop for pipe and steel outfitting supports high internal quality standards, shortens lead times, and improves overall project execution.

    The Welding Academy strengthens in-house welding expertise through certification, test welds, and continuous skills development.

  • Paint hall

    Helsinki Shipyard operates four paint chambers: three for blocks and one for outfitting.

  • Office building, terminal and workshops

    The facility brings together office space, storage, and outfitting and commissioning workshops, while the terminal provides direct access to vessels at the outfitting quay. The office is located close to production, enabling efficient collaboration between design, engineering, and production teams.

  • Quay

    The shipyard’s quays support outfitting for vessels up to 280 meters in length. Up to five vessels can be moored simultaneously across the four quays.

Helsinki Shipyard in numbers

  • 161

    years in operation

  • 500+

    vessels delivered

  • 620+

    own employees at the shipyard

  • 2000+

    suppliers and partners

  • 280

    meters long covered dry dock